Train Route

06520 BIDR SMVB SPL Route

Train is not in operation currently
StationArrDepDist.PF
1BidarFirst14.300
2Humnabad15.1815.2053
3Kalaburagi16.5016.55126
4Shahabad17.2017.25152
5Wadi17.4017.45162
6Yadgir18.0818.10201
7Krishna18.4018.50225
8Raichur19.1819.20270
9Manthralayam Road19.4319.45298
10Adoni20.2320.25339
11Guntakal Jn21.4021.45391
12Anantapur22.4822.50459
13Dharmavaram Jn23.4023.45492
14Hindupur00.5100.52583
15Yelahanka Jn.02.0802.10666
16Smvt Bengaluru04.30Last684
1 2 3     8
4 5 6 7
9 10 11   16
12 13 14   15
17 18 19   24
20 21 22   23
25 26 27   32
28 29 30   31
33 34 35   40
36 37 38   39
41 42 43   48
44 45 46   47
49 50 51   56
52 53 54   55
57 58 59   64
60 61 62   63
65 66 67   72
68 69 70   71
SL
Sleeper
शयनयान
UB
Upper Berth
ऊपरी बर्थ
MB
Middle Berth
मध्य बर्थ
LB
Lower Berth
निचली बर्थ
SL
Side Lower
साइड लोअर
SU
Side Upper
साइड ऊपरी

Abount Train 06520 BIDR SMVB SPL

06520 BIDR SMVB SPL, Bidar to Smvt Bengaluru runs F, has classes SL GN. Pantry is not available. Fare does not include food cost. Total travel time of the train is 14 hr. Average speed is 49 km/hr. Advance reservation period (ARP) is 60 days. 06520 BIDR SMVB SPL is owned by South Western Railway (SWR). Its rake is shared with , . Mail Express fare is applicable.06520 BIDR SMVB SPL category type is Special. It is a Broad Gauge train.